Colonel Wright Elementary School
Division
Buildings
Project Details
Project Story
MCE was hired to analyze and upgrade the roof structure of the sub-grade boiler room to support approximately 6" of soil. The modifications to the room included a seismic upgrade. A unique aspect of this project was that the entire room is below grade and supports a lawn on the roof. The modifications and upgrade were designed using the 2006 International Building Code. MCE was responsible for the design of the framing to support the roof.
Gallery
Gallery:














































































































































