Delta Ponds Ecosystem Rehab

← Back to Projects

Delta Ponds Ecosystem Rehab

Eugene, OR

Division Non-Building Structures

Project Details

Project Story

As part of a design-build team MCE designed a new head wall, wing walls, and an outflow structure at River Ponds Section 206. MCE designed two gated 6 foot high by 6 food wide (interior dimensions) reinforced concrete box culverts. These are required to control water flow from the Willamette River into the Delta Ponds system.

Project Team

Ron Vandehey

Principal

Kylean Gunhus

Associate Engineer

Related Sectors