Delta Ponds Ecosystem Rehab
Division
Non-Building Structures
Project Details
Project Story
As part of a design-build team MCE designed a new head wall, wing walls, and an outflow structure at River Ponds Section 206. MCE designed two gated 6 foot high by 6 food wide (interior dimensions) reinforced concrete box culverts. These are required to control water flow from the Willamette River into the Delta Ponds system.
Gallery
Gallery:


















































































































































