Butternut Creek Footbridge

← Back to Projects

Butternut Creek Footbridge

Washington County, OR

Division Non-Building Structures
Client Hillsboro School District

Project Details

Project Story

Hillsboro School District Footbridge Replacement
 
The Challenge
 
When the Hillsboro School District requested an evaluation of its aging footbridge, Miller Consulting Engineers, Inc. (MCE) determined that the existing log structure was becoming structurally inadequate. Without intervention, the bridge would need to close within a year due to safety concerns for pedestrians. The replacement also needed to minimize disruption to the surrounding sensitive wetland area while remaining within the district’s project budget.
 
Our Response
 
MCE designed a new structural steel footbridge spanning the wetland, supported by four concrete piers. The bridge was designed for off-site fabrication as a single piece, allowing it to be transported to the site and lifted into place with minimal disturbance to the wetland. This approach also simplified construction and reduced long-term maintenance requirements for the district.
 
The Outcome
 
The new steel footbridge provided a durable, low-maintenance solution that improved pedestrian safety while protecting the surrounding wetland. By combining efficient structural design with off-site fabrication, MCE helped deliver the project for approximately half of the school district’s allocated construction budget.

Project Team

Kevin McCormick

Principal

Project Metrics

Location
Washington County, OR
Division
Non-Building Structures

Project Partners

Client
Hillsboro School District