Milk Creek Bridge

← Back to Projects

Milk Creek Bridge

Canby, OR

Size 83 ft
Division Non-Building Structures

Project Details

Project Story

MCE provided structural drawings and calculations for the new 83 foot concrete and steel bridge over Milk Creek. First, MCE inspected the existing bridge. Then a vertical and lateral analysis of the proposed new bridge structure to replace the existing bridge was performed. The bridge superstructure and substructure was designed to meet the requirements for AASHTO HS25 loading. MCE coordinated with the geotechnical and civil surveying team, along with the community homeowners, to complete the bridge on time and within budget.
  • Design of concrete and steel bridge
  • Coordination of multidisciplary subconsultants
  • Designed to meet the requirements for AASHTO HS25 loading

Project Team

Kevin McCormick

Principal

Project Metrics

Location
Canby, OR
Size
83 ft
Division
Non-Building Structures

Related Expertise