5-Ton Jib Crane Hoist
Division
Non-Building Structures
Project Details
Project Story
MCE provided the preliminary engineering for a 36 foot cable-stayed jib crane capable of carrying a 10,000 pound lift. This jib crane is used as part of a fish bypass system to lift fish hoppers from a floating surface collector out of the water and into a tank for transfer around Cushman Dam.
Gallery
Gallery:








































































































































